[Abstract] In August 2022, the procurement and calibration of the Procurement Project of Distributed Fault Locating Device (Project No.: YT2022-DW078M) for 220kV Outgoing Line and Opposite End Expansion Bay PC Project (Line Part) of Guangxi Rongshui Qingl
[Abstract] On the monitoring platform, by turning on the remote inspection individual equipment, it is clear that the operation site, the staff in insulating clothing are changing the drop switch in order, and their every move is transmitted to the platfo
[Abstract] Recently, Nanchang Tongyuan Industrial Co., Ltd. has completed the publicity activity of bid winning candidates for the second batch of materials public bidding procurement (bidding No.: TYWZ-GKZB-220802) in August 2022. Shenzhen Dingxin Intell
With the development of electric power construction, the scale of power grid is constantly expanding, and more and more power grid construction and equipment maintenance work are carried out under complex terrain conditions. The patrol inspection and main
Thunder and lightning are common natural phenomena. In recent years, the shunt of lightning current will change. From the lightning protection test, some lightning currents show that when the zinc oxide arrester valve is affected with damp or the environm
Customer Service Hotline
+8618926454155
The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.
Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map
QQ Consulting
contact number
Email consultation
Scan WeChat